Author: bradvaillancourt

  • Upper Oldman – 2009

    Upper Oldman – 2009

    Major trail work took place during July 2009.  A newly formed volunteer group dedicated to the ongoing maintenance of the GDT, the Friends of the Great Divide Trail, spearheaded the effort by recruiting new volunteers, obtaining permits from the Alberta Government, and arranging for donations of food and the loan of power tools and equipment.

    The GDT route through the upper Oldman area had seen little or no maintenance since the mid-1980s and many trail users reported losing the Trail entirely near the old Galena Mine.  During a 4-day outing, ten volunteers from Alberta and BC constructed a new log bridge over the Oldman River, and carried out tread work and brush clearing for several kilometres in each direction. New paint blazes were also applied throughout. The weather was ideal, the scenery was fantastic, the bugs few, and the camaraderie was great! Everyone went home feeling a huge sense of accomplishment.

    The Trail Crew
    The Trail Crew
    The Old Bridge
    The Old Bridge
    The Old Bridge across the Oldman River
    The Old Bridge across the Oldman River
    Setting the Footing
    Setting the Footing
    The new bridge
    The new bridge
    The test
    The test
    The Builders
    The Builders
    Camp
    Camp
    Company
    Company
    Lunch
    Lunch
    Cutting new trail bed
    Cutting new trail bed

    This slope below the Galena Miracle mine is a spot where hikers have often had trouble staying on the Trail.

    Reblazing
    Reblazing
    Pruning
    Pruning
  • Baril Creek – 2006

    Baril Creek – 2006

    In September 2006, members of the Great Divide Trail Association and the Alberta Wilderness Association, with help from several Pathway Connectivity employees, did bridge construction across Baril Creek and trail clearing up to Fording River Pass.  The entire Baril access trail was also re-blazed.

    Cornwell-cirque
    On the Divide: Baril Peak (l) and Mt Cornwell from Fording Pass summit
    New bridge across Baril Creek
    New bridge across Baril Creek
    Old trapper's shelter below the pass
    Old trapper’s shelter below the pass
  • Cataract Creek – 2004

    In 2004, major trail clearing, bridge building and some trail realignment was done between Cataract and Lost Creeks, across the spectacular Cataract Plateau. The new line was surveyed in June, with construction work occurring in August. The entire section from Rye Ridge to Cataract Plateau was re-blazed as well.

    cabin
    Perkinson’s Cabin – still with us after many years!
    Lunch stop on the ridge during the survey with Mt Farquhar (left) and an unnamed peak (right)
    Lunch stop on the ridge during the survey with Mt Farquhar (left) and an unnamed peak (right)

     

    The Divide from the Cataract Plateau
    The Divide from the Cataract Plateau

     

    trail marker becomes part of trail
    Reusing a fallen blazed tree for a new bridge stringer

     

    Putting in a switchback
    Putting in a switchback

     

    Headwaters of Cataract Creek with the Divide behind
    Headwaters of Cataract Creek with the Divide behind