In 2004, major trail clearing, bridge building and some trail realignment was done between Cataract and Lost Creeks, across the spectacular Cataract Plateau. The new line was surveyed in June, with construction work occurring in August. The entire section from Rye Ridge to Cataract Plateau was re-blazed as well.
Perkinson’s Cabin – still with us after many years!
- Lunch stop on the ridge during the survey with Mt Farquhar (left) and an unnamed peak (right)
The Divide from the Cataract Plateau
- Reusing a fallen blazed tree for a new bridge stringer
- Putting in a switchback
Headwaters of Cataract Creek with the Divide behind